Monday, April 17, 2017

Trim Carpentry and Other Things :)

We made an appointment with our PM to check on the house since we couldn't walk the home on Saturday. Our PM said he doesn't have to be around for us to walk the house, just give him a heads up and check with the SRs first. We're cool with that.

The walls have been sanded and primed, we have cabinets in the kitchen and bathrooms, interior doors, and trim base. Looking good! We're so happy we got to see the house today. They should be tiling this week and granite will be coming soon, too :)

Hall bath and the infamous bath tub!

Master bathroom ans our double sinks

Railing is in

Kitchen and sunroom

With an empty house, that island looks huge!

Front entrance


And this is what's going to be our dormers! :D




Tuesday, April 4, 2017

Pre-Drywall Meeting

Hello!

We had our pre-drywall meeting today. Our PM tried to reschedule it to this Thursday since they haven't started insulation on our house yet, but our inspector said he actually would prefer to see the house without it and make sure nothing major would be behind any insulation. So that's what we did.

Frank was very nice to us, as usual. We walked the house and he explained to us what we were seeing. We had a few questions about the house, but we didn't know exactly what to look for. Having the inspector with us was very important as he did catch a couple of things we would have never thought of (a crack on the window frame, a disconnected HVAC duct, a couple of cables not nailed to the walls). Nothing too major, according to him, but glad he caught it. He will be sending us a report by tomorrow.

Now, the most important thing: the closing date.
According to Frank, they are having some issues with the electric company coming over, installing the meter, and starting service in the homes. Apparently, demand is way too high and they are having issues keeping up with it all. Frank hopes and is somewhat confident that they will have it all taken care of by first week of May. If that's the case, we should have our walk on 5/27 and close 5/31. We had talked to RH about closing in June, so I'll remind our SR of it and maybe we can schedule it for a couple of days later-- 6/2. That would work perfectly for us :)

We asked Frank for a few favors, but unfortunately he couldn't help us. They were:
- leave the granite lip out for backsplash
- install our fans
- install our cabinet knobs (we bought oil bronze ones). This he may be able to help after the house passes the QA inspection.

This is it! We are so excited and can't wait to move! :D


Monday, April 3, 2017

Appraisal

We received our appraisal back today and good news: OUR APPRAISAL CAME BACK ABOVE SALES PRICE! That's an instant $1483 equity for us :)

We have our pre-drywall tomorrow. I'll be back with a longer post after that.

Wednesday, March 29, 2017

Pre-drywall Meeting Scheduled

Our pre-drywall meeting has been scheduled for this Tuesday, 4/4. So exciting!
We didn't know if we should have an independent inspector with us or not, but after asking a few people, we decided to go for it. We are not sure what to look for, so having that (experienced) extra set of eyes will definitely be helpful. Very worth it the fee. We will pay our inspector $300.

On a side note about our dormers issue, PM said they will be installing the dormers late April as he needs the framers to come around with a crane and we are past that framing stage. We are ok with it, as long as it is installed properly and before we move. Just a heads up for those following our blog in case they might wonder where the dormers are :)



Sunday, March 19, 2017

Update!

Hello Y'all!

We heard from one of our SRs that the guys were working hard on our place on Saturday, so we stopped by today to see if there was any progress made since Wednesday (the day we visited to see how Tuesday's snow impacted construction). We got an email from the PM on Friday saying that the snow did delay them a little bit, but that the roof and HVAC will be installed next week. As of now, pre-drywall should be on the second week of April, but nothing has been scheduled yet.

We have exterior doors, windows, and I'm assuming they are done with framing. We snuck inside the house and took some pictures. Enjoy!

We got windows and a door :)

View from front door - stairs

View from front door - access to garage

Basement

Stairs from first to second floor

Morning room - pantry to the right. A nice deck will be outside those doors

Living room - <3 bay window

Second / main floor from morning room. Kitchen will be to the left, dining area to the right

Stairs from second to third level

Laundry room on the left; hall bathroom to the right

Master bedroom with master bathroom on the right

Back of the house