Pre-Drywall Meeting

Hello!

We had our pre-drywall meeting today. Our PM tried to reschedule it to this Thursday since they haven't started insulation on our house yet, but our inspector said he actually would prefer to see the house without it and make sure nothing major would be behind any insulation. So that's what we did.

Frank was very nice to us, as usual. We walked the house and he explained to us what we were seeing. We had a few questions about the house, but we didn't know exactly what to look for. Having the inspector with us was very important as he did catch a couple of things we would have never thought of (a crack on the window frame, a disconnected HVAC duct, a couple of cables not nailed to the walls). Nothing too major, according to him, but glad he caught it. He will be sending us a report by tomorrow.

Now, the most important thing: the closing date.
According to Frank, they are having some issues with the electric company coming over, installing the meter, and starting service in the homes. Apparently, demand is way too high and they are having issues keeping up with it all. Frank hopes and is somewhat confident that they will have it all taken care of by first week of May. If that's the case, we should have our walk on 5/27 and close 5/31. We had talked to RH about closing in June, so I'll remind our SR of it and maybe we can schedule it for a couple of days later-- 6/2. That would work perfectly for us :)

We asked Frank for a few favors, but unfortunately he couldn't help us. They were:
- leave the granite lip out for backsplash
- install our fans
- install our cabinet knobs (we bought oil bronze ones). This he may be able to help after the house passes the QA inspection.

This is it! We are so excited and can't wait to move! :D


Wednesday, March 1, 2017

Construction Update - Week 8 - Framing

If you remember, during week 6 we received an update from our PM that in week 7 (last week) the slab was going to be poured and during week 8 (this week), framing would begin.
This past Saturday, I stopped by the community to talk to my SR and the slab wasn't done. I was a little upset, but since we're trying to settle a little later than the estimated completion anyway, I didn't stress about it. I figured framing was going to be pushed at least out a week or so.


Today, I got this video from my SR. Three days ago we didn't even have a slab and today we're pretty much done with the first level?! HOLY CRAP!


We'll stop by for pictures sometime this week.


YAY! :D

Sunday, February 19, 2017

Construction Update and Pictures - Week 6

Hi all :)

In addition to Sam's video on Wednesday, Frank (PM) updated us on what's been done and what's coming next. Here's where we are as of Friday 2/17:

We've completed the foundation and begun tying in the water and sewer and doing the groundwork plumbing. If weather cooperates next week I'm hoping to have the slab poured so we can start framing a week from Monday.

Oh yea, Frank. Weather will be just fine :D




Chad and I stopped by on Saturday and took some pictures. Funny how during the foundation step of the process, the house looks so tiny!


Panoramic of our row. There will be 5 houses. We have the second from the right to the left.

Our one-car garage at the front of the house. The front door will be to the left of the garage. 

Picture of the back of the house. Our garage to the left. The neighbor's front door and ours will be side to side.

Another picture of the back of the house. It shows the foundation wall a little better.